z

This section doesn’t currently include any content. Add content to this section using the sidebar.

Image caption appears here

Add your deal, information or promotional text

z FEATURES

Features

  • GPS Location Tracking
  • Emergency SOS Contacts
  • Secured/Encrypted End-To-End Individual & Group Chat In-App Messaging
  • CPC Approved Kids Product
  • Children's Online Privacy Protection Act (COPPA) Safe Harbor Certified Product
  • 2-Way HD Video & Voice Calling
  • 20+ Parental Controls
  • Free Streaming Music
  • 2x 5MP Photo & Video Cameras
  • Reminders & Do Not Disturb Mode
  • Activity Tracker & Step Goals

Details

  • Made for Kids Ages 5-12 Years Old
  • IP67 Water Resistance
  • Kid-Proof
  • Drop-Proof
  • Shock-Proof
  • Made with Heavy-Duty Durable Materials

Product Size: 44.5 × 41.5 × 16 mm
Maximum Wristband Size: 7.48 in
Data Security: COPPA Safe Harbor Certified Product
Connectivity: Cellular 4G/LTE/Bluetooth/GPS

CPU: 64-bite Quad-core Processor
Ram/ Rom: 1G/ 8G
SIM Card: Nano SIM
Weight: 68g
Display: 1.54 inches, TFT Touchscreen
Camera Resolution: 5 Million Pixels
Camera Quantity: 2
Water Resistance: IP67
Battery: Rechargeable Lithium-ion 1000 mAh
Standby Time: 100 Hours
Input: 500 mAh / 5V
Wi-Fi: 4 (a/b/g/n)
Bluetooth: 4.2 Low Energy

Universal Cellular Frequency Bands:
LTE: B1/B2/B3/B4/B5/B7/B12/B17/B66
UMTS: B1/B2/B4/B5

1x TickTalk 4 Kid’s Smartwatch
1x USB Charging Cable
1x TickTalk Wireless SIM Card (U.S. only)
1x Pre-Installed Screen Protector
1x SIM Lid Opener
z FEATURES

Features

  • GPS Location Tracking
  • Emergency SOS Contacts
  • Secured/Encrypted End-To-End Individual & Group Chat In-App Messaging
  • CPC Approved Kids Product
  • Children's Online Privacy Protection Act (COPPA) Safe Harbor Certified Product
  • 2-Way HD Video & Voice Calling
  • 20+ Parental Controls
  • Free Streaming Music
  • 2x 5MP Photo & Video Cameras
  • Reminders & Do Not Disturb Mode
  • Activity Tracker & Step Goals

Details

  • Made for Kids Ages 5-12 Years Old
  • IP67 Water Resistance
  • Kid-Proof
  • Drop-Proof
  • Shock-Proof
  • Made with Heavy-Duty Durable Materials

Product Size: 44.5 × 41.5 × 16 mm
Maximum Wristband Size: 7.48 in
Data Security: COPPA Safe Harbor Certified Product
Connectivity: Cellular 4G/LTE/Bluetooth/GPS

CPU: 64-bite Quad-core Processor
Ram/ Rom: 1G/ 8G
SIM Card: Nano SIM
Weight: 68g
Display: 1.54 inches, TFT Touchscreen
Camera Resolution: 5 Million Pixels
Camera Quantity: 2
Water Resistance: IP67
Battery: Rechargeable Lithium-ion 1000 mAh
Standby Time: 100 Hours
Input: 500 mAh / 5V
Wi-Fi: 4 (a/b/g/n)
Bluetooth: 4.2 Low Energy

Universal Cellular Frequency Bands:
LTE: B1/B2/B3/B4/B5/B7/B12/B17/B66
UMTS: B1/B2/B4/B5

1x TickTalk 4 Kid’s Smartwatch
1x USB Charging Cable
1x TickTalk Wireless SIM Card (U.S. only)
1x Pre-Installed Screen Protector
1x SIM Lid Opener

Search

z